Steelhead LNG’s Transaction for the Front-End Engineering and Design of Two At-Shore LNG™ Hulls

Baker Botts represented Steelhead LNG on the deal Steelhead LNG, Huu-ay-aht First Nations, and Hyundai Heavy Industries’ Shipbuilding Division formalized the contract for the front-end engineering…

Standard 1 Year Membership Required

You must be a Standard 1 Year member to access this content.

Join Now

Already a member? Log in here
Avatar

Author: Paolo Bossi

Standard 1 Year Membership Required

You must be a Standard 1 Year member to access this content.

Join Now

Already a member? Log in here