Sveriges Vindkraftkooperativ’s Acquisition of 24MW Dragaliden Wind Farm

Cirio advised Enercon on the deal. ENERCON divested its fully operational 24MW Dragaliden wind farm to Sveriges Vindkraftkooperativ ek. för. The wind farm is located in the vicinity…

Standard 1 Year Membership Required

You must be a Standard 1 Year member to access this content.

Join Now

Already a member? Log in here
Maha Kanaan

Author: Maha Kanaan

Standard 1 Year Membership Required

You must be a Standard 1 Year member to access this content.

Join Now

Already a member? Log in here